Civil/Structural Engineer The Project: Phase I of the Lower Churchill Project will consist of the Muskrat Falls generating facility with a capacity of 824 MW. The transmission system project will include 1,200 km of High Voltage Direct Current (HVDC) overhead transmission lines crossing from Labrador to the island of Newfoundland via sub-sea cables and associated converter stations, as well as Hig...
full job description